Resources:ACS Truganina

From Data Centre Moratorium Wiki

Update this data centre

General Information
Type Mega campus
Status Permitted
Address 114-146 LEAKES ROAD TRUGANINA 3029
Developer(s) ACS Group,CIMIC Group,Global Infrastructure Partners (GIP)
Permit Pathway Council Application for Planning Permit
Local Council Wyndham City Council
Build Details
Cost TBA
Area 132,400 m2
Power draw 210MW
Backup TBA
Community Opposition
Community groups


Summary

Planning Permit Pathway

WYP15036/25 - Application for Planning Permit - 114-146 Leakes Road TRUGANINA VICTORIA 3029

Description: 33.02-1 – Use of land for a data centre 33.01-4 – Construct a building or construct or carry out works for a data centre 52.29-3 - Create or alter access to a road in a Transport Zone 2
Lodged: 28 March 2025
Approval date: 25 September 2025

WYP15036/25.02 - Application to Amend WYP15036/25

Description: Section 72 Amendment to the Plans - amend building design and site layout, including a reduction in building scale, reconfiguration of administration and equipment areas, revised storage yard layout, and landscaping details.
Lodged: 8 January 2025
Approval date: Still under review

Build Plan

A storm water report produced by WSP on 14 March 2025 [1] provides information on the originally proposed build.

"The Planning Permit relates to a proposal at known as Leakes Road Data Centre (the project), located at 114-146 Leakes Road, Truganina, legally referred to as Lot 11 of Subdivision 739073B, Volume 08858 Folio 983."

"The Project site is approximately 13.24 hectares located in Truganina within the Wyndham City Council local government area (LGA). The site is located on the northeast corner of Leakes Road and Delivery Drive, as generally shown in the figure below."

"The project’s masterplan features a data centre facility, proposed to be delivered in stages to facilitate the requirements for high density data storage. The data centre will operate 24 hours a day, 7 days a week."

"The data centre intends to generate up to 210MW IT capacity (240MVA), complete with an on-site 220kV substation and associated offsite infrastructure connecting the project to AusNet Altona Terminal Station."

Power Connection

On 31 October 2025, AusNet submitted PA2504040 to the Department of Transport and Planning through the Development Facilitation Program (DFP) [2]. The permit application is for an "electricity connection along Cherry Lane, Fitzgerald Road and Leakes Road, between the Altona Terminal Station (ATS) and the PAC1 Leakes Road Data Centre (PAC1 LRDC), a customer substation at the PAC1 LRDC and utility installation works at the ATS." The permit was approved on 17 February 2026.

AusNet officially announced the project, and outlined the works [3]:

  • a new 220kV underground transmission cable
  • a new 220kV substation at the data centre site
  • modifications to the existing 220kV switchyard at Altona Terminal Station

On 9 July 2026, AusNet announced that works would commence from mid-July to December 2026 [4].

Developer Identification

The applicant has been referred to as "Leakes Rd DC Pty Ltd" in various documents. A company extract and associated document sourced from ASIC confirms that the parent company is ACS ACTIVIDADES DE CONSTRUCCION Y SERVICIOS S.A.

In November 2025, ACS Group and Global Infrastructure Partners (GIP), a part of BlackRock, entered into an agreement to form a 50-50 joint venture named Coravel. The platform is "dedicated to developing and operating next-generation data centers worldwide" [5]. Per industry reporting: "Previous company presentations suggested the firm had 1.1GW of potential data center capacity (278MW in Spain, 220MW in Australia, 300MW in the US, and 300MW in Chile)" [6].

ASIC Documents:

Build stages