| Build Details | |
| Cost | $1.11 billion |
| Area | 211,464 m2 |
| Power draw | 336MW (planned total) |
| Backup | 48 x 20,000L diesel generators (7ML total) |
| Community Opposition | |
| Community groups | Broadmeadows Progress Association;No Campbellfield Data Centre |
Summary
Resources
File:300-340 Barry Road Campbellfield-Town Planning Report.pdf
Build stages
Stage 1 — Planned
- Stage 1 establishes the first 48MW data hall, with a gross floor area of roughly 29,600m² split between the building and external plant. It has been divided into Stage 1 and Stage 1B so the 48MW capacity can come online in parts rather than waiting for the entire building to be certified for occupancy.
Stage 2 — Planned
- Stage 2 adds a second 48MW data hall of similar scale to Stage 1, alongside a new 13,500m² substation zone intended to exceed the 66kV threshold used in Stage 1. This substation upgrade signals the site's power infrastructure is being built out ahead of the capacity that later stages will draw on.
Stage 3 — Planned
- Stage 3 contributes a third 48MW data hall, with a slightly larger footprint than Stages 1 and 2 at just under 32,000m² of gross floor area. This keeps the campus on its incremental 48MW-per-stage growth path toward the wider masterplan total.
Stage 4 — Planned
- Stage 4 delivers a fourth 48MW data hall, bringing the campus to 192MW of cumulative approved capacity across its first four stages. Its floor area is the smallest of the four initial stages at approximately 28,450m².
Stage 5 — Planned
- Stage 5 marks a step-change in scale, introducing the campus's first 72MW data hall across three storeys rather than two. At close to 47,840m² of gross floor area, it is substantially larger than any of the preceding 48MW stages.
Stage 6 — Planned
- Stage 6 delivers the second 72MW data hall alongside a standalone administrative building, taking the completed masterplan to its full 336MW, six-building capacity. Together with Stage 5, these final two stages account for 144MW of the site's total approved load.