Resources:HiQ Eco-Hub

From Data Centre Moratorium Wiki

Update this data centre

General Information
Type Mega campus
Status Proposed
Address 580 SUNBURY ROAD BULLA 3428
Developer(s) HiQ
Permit Pathway Development Facilitation Program (DFP)
Local Council Hume City Council
Build Details
Cost TBA
Area TBA m2
Power draw 1GW (proposed)
Backup TBA
Community Opposition
Community groups


Summary

Sunbury Eco-Hub is a project that was first announced by HiQ in August 2025 [1] after it had been issued a cap licence by Recycling Victoria. The license permits HiQ to process up to 750,000 tonnes of waste through a "waste-to-energy" facility [2].

In March 2026, HiQ released a brochure geared towards investors [3]. In it, HiQ details a plan for a "connected precinct" that includes:

  • a 750,000 tonne-per-annum waste-to-energy (WtE) facility that will produce "at least 80 megawatts of electricity".
  • a Battery Energy Storage System (BESS) that will provide "up to one gigawatt of storage capacity" and will be connected to nearby transmission lines.
  • 100 hectares of industrial land
  • over 50 hectares of residential land
  • a hyperscale campus that will "provide one gigawatt of processing capacity"

According to the project page, technical assessments have been completed (2024 - 2026) and the project is currently in the community engagement period. Once the community engagement period ends, HiQ will likely submit an application to the Department of Transport and Planning through the Development Facilitation Program (DFP)[4].

Brochure Screenshots

Build stages