Resources:NEXTDC M2
Appearance
| General Information | |
|---|---|
| Type | Hyperscale |
| Status | Expanding |
| Address | 75 Sharps Road, Tullamarine and 9 Barrie Rd, Tullamarine |
| Developer(s) | NEXTDC |
| Permit Pathway | Unknown |
| Local Council | Brimbank City Council |
| Build Details | |
| Cost | $0 |
| Area | 25,000 m2 |
| Power draw | 150MW |
| Backup | 1.5MW Piller rotary UPS supported by MTU (Rolls Royce) engines, supporting entire site load; minimum 12 hours fuel stored on-site per engine |
| Advocacy Resources | |
| Community push back | TBA |
| Resistance status | TBA |
| Advocacy information | TBA |
| Petition | TBA |
| Community resources | TBA |
Summary
Build stages
Stage 2 — Complete (1 January 2019)
- Stage 2 involved a 7-month base build and fit-out programme that added two levels, two data halls, and 15 switch rooms. Delivered via a precast structural redesign. [1]
Stage 3 — Complete (1 June 2023)
- Stage 3 constructed a 7,494m² "Innovation Tower" that houses five levels of offices, an auditorium, a commercial tenancy, training and end-of-trip facilities. [2]
Stage 4 — Complete
- Stage 4 constructed a new building with six data halls over five levels, including a 10MW data hall described as one of the largest of its kind in Victoria at the time of building. [3]
Stage 5 — Complete (1 March 2022)
- Stage 5 was an 11-month programme delivered during COVID-19 restrictions, adding five data halls, a loading dock, and contractor amenities. Approximately 3,750m² of additional technical space and 15MW of capacity. [4]
Stage 5.1 — Complete (1 July 2024)
- Stage 5B involved expansion works that delivered several further data halls for global cloud platform provider capacity.[5]
Stage 6 — Under construction
- Scheduled to add 8MW of new capacity. Completion targeted for 2025, but no industry news that it has been completed. [6]