Resources:NEXTDC M3
From Data Centre Moratorium Wiki
| General Information | |
|---|---|
| Type | Hyperscale |
| Status | Expanding |
| Address | 25 INDWE STREET WEST FOOTSCRAY 3012 |
| Developer(s) | NEXTDC |
| Permit Pathway | Development Facilitation Program (DFP) |
| Local Council | Maribyrnong Council |
| Build Details | |
| Cost | $1.5 billion |
| Area | 41,000 m2 |
| Power draw | 320MW |
| Backup | Diesel generators (total storage 510,000L) |
| Community Opposition | |
| Community groups | Citizens of Tottenham |
Summary
Build stages
Stage 1 — Complete (1 September 2022)
- Stage 1 delivered 27MW of IT capacity across six data halls, completed in September 2022. This established the initial operational base from which the wider 150MW-plus masterplan was designed to grow. [1][2]
Stage 2 — Under construction
- Stage 2 adds further data hall capacity to the campus and was reported nearing structural completion (top-out) in mid-2025. It has been positioned as part of the site's push to support higher-density, AI-driven compute demand rather than standard colocation load. [3]
Stage 4 — Under construction
- Stage 4 is being delivered concurrently with Stage 2 as part of the same capacity-expansion programme, with construction activity across both sites reported as of mid-2025. Together the two stages represent a significant step toward the campus's higher contracted-capacity targets beyond the original 150MW figure. [4]
Stage 5 — Planned
- A planned expansion, lodged for ministerial approval in February 2026 via the Development Facilitation Program (PA2604231). The extension plans to expand the site's masterplan capacity further and grow its physical footprint beyond the core Indwe Street parcel. As of mid-2026 it remains undetermined, sitting at referral stage pending assessment. [5]