Resources:PGIM Truganina

From Data Centre Moratorium Wiki

Update this data centre

General Information
Type Hyperscale
Status Permitted
Address 1 OROYA DRIVE TRUGANINA 3029; 435 MOUNT ATKINSON ROAD TRUGANINA 3029
Developer(s) PGIM (Prudential Financial)
Permit Pathway Development Facilitation Program (DFP)
Local Council Melton City Council
Build Details
Cost $422 million
Area 43,356 m2
Power draw 80MW (initial, per PGIM)
Backup Diesel generators (1,152,000L stored on site)
Community Opposition
Community groups


Summary

PA2504032

Power Connection

Electricity supply to the site is planned to be be delivered through a separate utility installation application (PA2604199) by AusNet. The application has been approved for a dedicated 220kV connection between the proposed Truganina Terminal Station (TNTS) at 442–542 Mount Atkinson Road and the data centre site, referred to in AusNet's own documentation as the "MAD" (Mount Atkinson Data centre) customer site. [1]

Project details:

  • A connection to the shared 220kV switchyard at the TNTS site
  • Approximately 600m of underground 220kV cable between TNTS and the data centre site
  • A 220kV/33kV substation at the data centre site

Construction: expected to take 12-18 months, with a "maximum number of 50 construction staff on site at any one time". Substation transformers may be delivered via the Port of Melbourne, Port of Geelong, or Glen Waverley. [2]

Broader context: TNTS is described as supporting "a range of future customer load connections in the nearby area", of which this connection (MAD) is confirmed as one. The identities of the other two customer sites are not confirmed in the documents reviewed to date, though property developers Goodman Group lodged a data centre application (PA2604503) on 1 July 2026 via the Development Facilitation Program (DFP) at 433 Mount Atkinson Road, Truganina (see Goodman Truganina for more information)

Build stages

Stage 1 — Planned

Planning permit PA2504032 was issued 6 May 2026 by the Minister for Planning. The permit has approved an 8-storey, 34m-tall data centre building with a total gross floor area of 43,356sqm. The building will comprise a data hall, an attached three-storey office, guard house, water tanks and plant enclosures [3].

A February AFR report frames the application as the "first stage" of PGIM's planned data centre campus on the site, quoting PGIM's Morgan Laughlin: "We're capable of building a lot more than the initial 80 megawatts that we have planned, but that will be driven by future power availability." [4]