Resources:STACK MEL01 Campus
From Data Centre Moratorium Wiki
| General Information | |
|---|---|
| Type | Hyperscale |
| Status | Expanding |
| Address | 369 PALMERS ROAD TRUGANINA 3029; 399 PALMERS ROAD TRUGANINA 3029 |
| Developer(s) | STACK Infrastructure |
| Permit Pathway | |
| Local Council | Wyndham City Council |
| Build Details | |
| Cost | TBA |
| Area | 38,000 m2 |
| Power draw | 72MW (180MW projected) |
| Backup | 48 hours onsite fuel storage (unknown volume) |
| Community Opposition | |
| Community groups | |
Summary
Build stages
Stage 1 —
- MEL01A was completed in August 2023. The building draws 36MW of power, is located to the north of the site and consists of nine data halls across three floors. [1][2].
Stage 2 —
- MEL01B was completed in November 2025 [3]. The building draws 36MW of power, is located to the south of the site and consists of 12 data halls across three floors. [4]
Stage 3 —
- MEL01C, reported at 54MW across ~47,008sqm, one of two further buildings expanding the campus to a stated 180MW/four-building total [5]. On 23 July 2025, STACK secured $1.3 billion in green financing to fund "the next phase of development" at MEL01 [6] and has contracted construction firm Hickory to deliver MEL01C/D [7].
Stage 4 —
- MEL01D, reported at 54MW across ~47,008sqm, one of two further buildings expanding the campus to a stated 180MW/four-building total [8]. On 23 July 2025, STACK secured $1.3 billion in green financing to fund "the next phase of development" at MEL01 [9] and has contracted construction firm Hickory to deliver MEL01C/D [10].