Resources:Stockland Laverton North
From Data Centre Moratorium Wiki
| General Information | |
|---|---|
| Type | Hyperscale |
| Status | Proposed |
| Address | 72-76 CHERRY LANE LAVERTON NORTH 3026 |
| Developer(s) | Stockland,EdgeConneX |
| Permit Pathway | Development Facilitation Program (DFP) |
| Local Council | Wyndham City Council |
| Build Details | |
| Cost | TBA |
| Area | 350,000 m2 |
| Power draw | 250MW |
| Backup | TBA |
| Community Opposition | |
| Community groups | |
Summary
Build stages
Stage 1 — Proposed
- On 5 May 2026, Stockland lodged a planning permit application through the Development Facilitation Program (PA2604378). The application description outlines a proposed development of two-storey data centre buildings. As of July 2026, no decision has been made. The site currently operates as the Cherry Lane Distribution Centre [1] and is occupied by Toll Group. In February 2026 Stockland stated it had secured power for approximately 350MW of data centre development across its two Melbourne sites (Cherry Lane and the Brooklyn Distribution Centre) [2].